2021-7-1  Cut joints deep enough. Cut joints 25% of the depth of the slab. A 4" thick slab should have joints 1" deep. How to cut joints. Groover tools cut joints in fresh concrete. Saw cutting cuts joints as soon as the concrete is hard enough that the edges abutting the cut don't chip from the saw blade. Place joints under walls or under carpet areas.

Get price

Concrete Control Joints - How To Minimize Cracking In ...

Properly placed control joints will allow concrete to shrink, expand, and contract, reducing the tendency for it to crack. I've been in the concrete floor business for over 30 years. I've installed thousands of lineal feet of control joints in my concrete floors. Most of the time we saw the joints using an early entry soff-cut

Get price

Joints in Concrete Construction - Types and Location of ...

2013-1-10  Fig.2: Types of Construction Joints in Concrete Structures. 2. Expansion joints The concrete is subjected to volume change due to many reasons. So we have to cater for this by way of joint to relieve the stress. Expansion is a function of length. The building longer than 45m are generally provided with one or more expansion joint.

Get price

The Purpose of Control Joint Cuts - Cobra Concrete

Control joints are generally cut to be about one fourth of the thickness of the slab. Spacing control joints are not as formulated as depth due to factors like slab type, dimensions, and the kind of concrete. A general rule of thumb for spacing is 24 to 30 times the slab thickness.

Get price

Concrete Crack Repair Archives - The Constructor

Control joints are provided in a concrete slab to reduce cracks formed due to shrinkage. The specifications of the control joints such as the depth, timing and place of the cut play an important role in the efficiency of the ...

Get price

When should you cut control joints in concrete?

2020-5-30  Just so, how do you cut control joints in concrete? Depth of the Control Joint The thumb rule used to determine the depth of the control joint is to cut the joints one-quarter to one-third the slab thickness. If the concrete slab laid is 150mm thick, the depth of the joint must be 40mm to 50mm.

Get price

Placing Joints in Concrete Flatwork- Why, How, and When

Contraction joints may be tooled into the concrete surface at the time of placement. Joints may be tooled into the surface (first pass) prior to the onset of bleeding or immediately with the first pass of the floating operation. The longer the first pass for jointing is delayed the more difficult it will be to shape clean straight line joints.

Get price

Control Joint vs. Expansion Joint Difference - The

Control Joint in Concrete. Control joints in concrete are provided at regular interval to from a weak plane, so that cracks are formed at the joints but not in undesired places. Control joints are provided in concrete pavements, slabs

Get price

How to Prevent Concrete Curling? [PDF] - The Constructor

Cure the concrete properly, including the joints and edges of the slab. When the membrane curing method is used, the application of the membrane is performed twice. The second application is done at right angles to the first application. 5.

Get price

How to Cut Control Joints in Concrete - Mastercut

2018-5-8  A control joint is an intentional point of weakness cut within the slab to control where cracks will inevitably appear. How and When to Cut Control Joints Cut in Concrete. Once the concrete for a slab is poured a control cut needs to be made with a concrete saw within 6-18 hours afterwards to avoid the risk of randomised cracking.

Get price

Concrete Control Joints - How To Minimize Cracking In ...

Properly placed control joints will allow concrete to shrink, expand, and contract, reducing the tendency for it to crack. I've been in the concrete floor business for over 30 years. I've installed thousands of lineal feet of control joints in my concrete floors. Most of the time we saw the joints using an early entry soff-cut

Get price

The Purpose of Control Joint Cuts - Cobra Concrete

Placing a control joint into a slab means carefully placing planned cuts into the concrete to allow cracks underneath the surface to be straight and not disturb the surface aesthetics. Control joints are generally cut to be about one fourth of the thickness of the slab. Spacing control joints are not as formulated as depth due to factors like ...

Get price

When should you cut control joints in concrete?

2020-5-30  Thereof, how do you cut control joints in concrete? Depth of the Control Joint The thumb rule used to determine the depth of the control joint is to cut the joints one-quarter to one-third the slab thickness. If the concrete slab laid is 150mm thick, the depth of the joint must be 40mm to 50mm.. Similarly, do I need to cut expansion joints in concrete? Saw cuts are a used to create control ...

Get price

Guide to Cutting Relief Joints in Concrete - American ...

2020-5-3  As the concrete begins to experience shrinkage stresses that exceed the strength of the concrete, there is a lot of “movement” in the slab. If the cuts are not in place before the stressing becomes extreme, the slab has no room to flex resulting in random cracks. The actual time to get on the concrete will be determined many factors ...

Get price

When to cut control joints in concrete slab? - Concrete ...

2005-9-29  As it turned out, the concrete contractor assigned the crew to a morning pour in a different town. The foreman, having given me the advice about the control joints, felt guilty about showing up late. He arrived at noon, roughly 24 hours after the pour, and went right to work. They cut 5 control joints.

Get price

Concrete slabs and control joints BRANZ Build

2005-8-1  Concrete slabs and control joints. 1 August 2005, Build 89. Concrete shrinks as it sets and will continue to shrink for at least 12 months after placing, depending on drying conditions. About 50% of the shrinkage occurs within the first 4 months. Figure 1: Four methods of farming free joints.

Get price

Rules for Designing Contraction Joints For Construction

2020-5-12  Rule #9: For joints installed with an early-entry dry-cut saw, joint depth should be 1-1/4 in. with a ± 1/4 in. tolerance for slabs with thicknesses up to 9 in. For thicker slabs, the saw cut ...

Get price

Control Joints, Expansion Joints and Cold Joints in Concrete

2021-5-4  A basic rule to follow when judging how deep a control joint should be is that it should be roughly 1/4 the depth of the concrete. If a concrete slab is 4 inches thick, the depth of the control joint should be 1 inch. Much of the time, the depth that finishers install control joints is less than what is normally recommended.

Get price

Concrete poured and no control joints cut - too late now ...

2019-7-13  Do they abut other masonry, if so they should have expansion joints. I wouldn’t hesitate to cut control joints in the long one. Should be 1/4 as deep as the thickness of the slab. Ease the edges and fill with self leveling joint sealer. Idealy that long one should have alternating control and expansion joints.

Get price

Concrete slabs and control joints - BRANZ Build

2014-3-30  into the slab when the concrete is poured. Control joints that are cut into the slab should be formed within 24–48 hours after pouring, depending on the ambient temperature. Cracking is most likely to occur at major changes of plan, so NZS 3604:2011 paragraph 7.5.8.6.4 requires that shrinkage control joints

Get price

Concrete Control Joints - How To Minimize Cracking In ...

Properly placed control joints will allow concrete to shrink, expand, and contract, reducing the tendency for it to crack. I've been in the concrete floor business for over 30 years. I've installed thousands of lineal feet of control joints in my concrete floors. Most of the time we saw the joints using an early entry soff-cut

Get price

How to Master Control, Contraction Concrete Expansion

2019-9-11  Mastercut Concrete have been cutting concrete in Sydney for over 20 years and have a fleet of skilled and mobile concrete cutters to cut the necessary contraction and control joints in your concrete slab soon after pouring. Our staff are equipped with

Get price

Guide to Cutting Relief Joints in Concrete - American ...

2020-5-3  As the concrete begins to experience shrinkage stresses that exceed the strength of the concrete, there is a lot of “movement” in the slab. If the cuts are not in place before the stressing becomes extreme, the slab has no room to flex resulting in random cracks. The actual time to get on the concrete will be determined many factors ...

Get price

Filling Control Joints in Concrete Slabs Concrete ...

2015-10-8  Installing control joints is nothing new. But in recent years there have been debates among concrete professionals over the best methods and materials to properly fill control joints. Owners want to move projects along as quickly as possible and there is always pressure to cut

Get price

Concrete slabs and control joints BRANZ Build

2005-8-1  Concrete slabs and control joints. 1 August 2005, Build 89. Concrete shrinks as it sets and will continue to shrink for at least 12 months after placing, depending on drying conditions. About 50% of the shrinkage occurs within the first 4 months. Figure 1: Four methods of farming free joints.

Get price

When to cut control joints in concrete slab? - Concrete ...

2005-9-29  As it turned out, the concrete contractor assigned the crew to a morning pour in a different town. The foreman, having given me the advice about the control joints, felt guilty about showing up late. He arrived at noon, roughly 24 hours after the pour, and went right to work. They cut 5 control joints.

Get price

Joints in Concrete Slabs JLC Online

2018-6-1  Think of these joints as scoring the slab, not unlike scoring drywall to control where it breaks. Contraction joints can be formed into a slab with a jointing tool early in the finishing process. These joints can also be cut into a slab with a circular saw equipped with a concrete-cutting blade. Saw-cut joints

Get price

When to Saw Control Joints Concrete Construction

1995-12-1  They feature automatic depth control and sawing speeds from 7 to 30 feet per minute. Sawcut depth is up to 13/8 inch and sawcut widths range from a 1/8-inch straight groove to a 1/2-inch T-cut. Electric-powered lightweight models use a smaller-diameter saw blade and cut notches 3/4- to 1-inch deep at sawing speeds of 4 to 11 feet per minute.

Get price

Concrete poured and no control joints cut - too late now ...

2019-7-13  Do they abut other masonry, if so they should have expansion joints. I wouldn’t hesitate to cut control joints in the long one. Should be 1/4 as deep as the thickness of the slab. Ease the edges and fill with self leveling joint sealer. Idealy that long one should have alternating control and expansion joints.